I have a newly bored well, need to set my pump at 400' with 20 ft sections of Schedule 80 drop pipe. I have purchased a nice 'drop pipe elevator', but was told also build a TRIPOD. I need some ideas on how the tripod is used to aid in setting the pipe ...would I hook the spool of wire to the tripod and also the pipe elevator to a chain off of the peak of the tripod? Is the tripod mostly to help stablize the 20ft lengths of Sch 80 while I screw on the next length? Would I use a safety rope also? I have never done this before so any advise is most needed.