I need to install a pump into a new well just to pump water to a jobsite.The well dia. is 10" 0 to 18',6" 18 to 125'.casing is 6" steel.Shoe location is 96'. Well is 10gpm. static water level 11'. Water level frist found at 99'. 99' to 116' 10 gpm swl 11'. well depth is 125'. What do I need? I will be using a 5kw generator to power the pump. I need to push the water 400'. Can I use a 1 1/4" pipe from the well motor to the top of well? then use 1" sched 40 pvc to the jobsite? thenks Earl