I'll be installing a pumptec plus on my well pump soon due the well being converted from being used to pressurizing water sys to just being used to fill a large storage tank. I think the well may be a low-yield, haven't tested it yet.

Anything I should be concerned abt in regards to installing a pumptec+ in series with a timer?

My original concern was if the timer was before the pumptec, the pumptec would error for low voltage when timer shut off the power, but I believe the pumptec+ will retest the incoming voltage and reset itself when voltage returns to normal. Can anyone confirm that?

If the timer was installed after the pumptec+, the pumptec would think the wire broke or the motor windings opened. Don't know if the pumptec would automatically reset after that kind of "fault".