is 105' of 1" galvanized pipe plus the foot
down in a 2" well too heavy to pull up by hand
to replace the foot?
or do I need to hire someone with a special rig on the back of thier truck with a fat invoice just to replace an 80 dollar part?
I would like to do this myself ( with help from friend of corse). I like to do most everything myself to save money and to learn new things. this website is a God send!
if it is practical and possible to pull up by hand is there any special way someone has thought of to hold pipe from falling back down(sure fire fail safe method) the hole as you work on disconnecting each section?