Having trouble getting the 4 ft. screen with a 2 ft. tail piece down the 2 in. casing as fine sand has come up the 2 in. casing and putting the point in a bind going thru it.
Had water running down the 2 in. casing all of the time to keep the sand down but it wasn't enough.
How do you get the point thru that small opening with some sand from the water pressure down below puting it in a bind???
I have done many of these in the past but this one is causing me problems.